2006: Innertube forms floated overhead, forming cantilevering coffers !

August 2006

July 2006

Aerial view of progress 2002.
Slow but sure, primarily a single handed labor of Bo Atkinson.

Plans are still evolving from the original model above. Pictures below show tilting up the first sand-cast wall panel which is hinged to a footing. A temporary pole brace is already bolted to the outside surface of wall section, as it is hinged up.
The tilted up wall section balances itself with the temporary pole brace. The ground floor level will be set nearly 2 ft above hinge.
Picture below shows the blue tarp used to shade work on mold. Tent is for retarding the initial cement set, for comfort and- for rain protection of both mold and wet cement. The uncovered, tubular frame for tarp is seen in the first pictures. Note the metal tube which is outside the blue shade, in nearly full sunlight. This tube looks like a TV antenna but instead is actually a carefully made, adjustable helix pattern which defines the sand mold. It is one of 3 experimental patterns built for this project. Part of the research here is to explore methods and tools for fitting curved walls.

Next picture shows change of tent and change of molding position. The lifting machine was having difficulty with the weight involved with tilting sections up. Therefore the mold beds were themselves formed in a position half way tilted up. The next picture shows the aluminum molding tool in place and smaller brown tarp.

Next picture shows 4 sections tilted up into place. (A 5th section, still on it's sand mold is seen under plastic sheet to humidify curing).
Next-- photo with translucent dome in background).

Next, the arch base is formed, "freestanding". My system involved filling cylinders made of wire mesh with concrete.

The upper arch is shown during concrete pour. The form is light gage expanded metal lath, supported by temporary scrap limber and poles. Click here to see more about this forming method. The steel reinforcement is 1/4 inch (smooth bar), spaced closely, a few inches apart.

Next pictures shows cured concrete, form work removed.

Later, the rim is continued over the arch top.

Research & Development
Through Free Exchange of Ideas
Comments are invited. Consultancy or constructive cooperation is offered.
Services ___Disclaimer ___Royalty Freedom ___About enersearch
These research reports are in the public domain and are furnished "as is". The author makes no warranty, express or implied, for any purpose. The author assumes no responsibility for the use or misuse of this research. Bo Atkinson, enersearch Tel : 207 342 5796 . . . (MaineUSA) E m a i l- boa1@pivot.net ___ Spam filters are in use, if your personal email doesn't get through, try calling: 1-207-342-5796. Spam or unsolicited sales which are not directly related to discussion of this work are not welcome.